Permits and Process by Jurisdiction

Marin County Kitchen Permits

The County for Kentfield and Greenbrae, town halls for Mill Valley to Novato — which office governs a Marin address, what the towns publish about exempt work, and how each one takes an application.

13 min readUpdated October 2026Reviewed by Andrey Voronenko

Quick Answer

Who issues a kitchen permit in Marin County?

The County’s Community Development Agency for unincorporated addresses such as Kentfield, Greenbrae and Tamalpais Valley; each of the eleven cities and towns for addresses inside its limits. Mill Valley’s own instructions tell applicants to confirm which before applying.

On exemptions, San Rafael names counter tops and finish work but not cabinets, and Mill Valley says non-structural remodels require plans. No Marin page we fetched exempts a cabinets-only project by name, so ask the town. Walls, pipes, wires and the exterior make it a permitted remodel everywhere.

Key Takeaways

  • Jurisdiction follows the parcel, not the postal address. Kentfield and Greenbrae are County permits; Larkspur, a few blocks away, issues its own. Mill Valley tells applicants to confirm city versus unincorporated first.
  • San Rafael’s exempt-work sheet names painting, papering, flooring, carpeting, counter tops and similar finish work, and movable counters under 5 ft 9 in — and never uses the word cabinets.
  • Mill Valley’s FAQ says most exempt work is cosmetic only, and its permit instructions say non-structural remodels require plans for review and approval.
  • Mill Valley is the only Marin jurisdiction here that publishes review times: express permits in 1 to 3 business days, plan check at a minimum of 4 to 6 weeks.
  • Ross routes larger permit projects — new residences, additions, large landscaping — through Advisory Design Review and the Town Council.
  • The County’s own pages could not be fetched at time of writing, and nothing on this page quotes them.

Who Issues a Kitchen Permit in Marin — the County or the Town?

Eleven incorporated cities and towns and one county, and the boundaries do not follow the mailing address.

Marin is the jurisdiction in this guide where the first question — who is the building official for this address — does the most work. The County of Marin’s Community Development Agency is the permitting authority for the unincorporated county, which includes some of its most-remodeled streets: Kentfield and Greenbrae, Strawberry and Tamalpais Valley, Marin City, the coastal villages such as Stinson Beach, and the San Geronimo Valley. Everything inside a city or town limit belongs to that city or town: Mill Valley, Sausalito, Tiburon, Belvedere, Ross, Larkspur, Corte Madera, San Anselmo, Fairfax, San Rafael and Novato each run their own building division. A Kentfield address and a Larkspur address can be on the same road and answer to different counters.

The towns know this is confusing, and the clearest of them say so on the application page. Mill Valley’s permit instructions tell applicants, before anything else, to confirm the address is in the City of Mill Valley and not an unincorporated area, and link a map for the purpose. We follow the same rule during Discovery for every Marin address, because the answer determines which portal the plans go into, what the town requires of the applicant, and — as the sections below show — whether the town commits to a review time on its own page.

One honest limit of this page: the County’s own web pages could not be fetched by our tools at the time of writing — the county site returned an access-denied response to every request — so nothing here quotes the County on what it exempts, how it routes applications, or what it charges. The County row in the table says so. The rest of this page is built from what the towns publish, and the towns are where most Marin kitchens are.

Marin jurisdictions compared. Each cell is drawn from the page named in the final column and listed under Sources; rows marked not fetched are jurisdictions whose sites refused automated access at time of writing, and nothing is asserted for them beyond the general city-versus-county structure.
JurisdictionWho issuesTypical triggerWhere to applySource
Unincorporated Marin (Kentfield, Greenbrae, Strawberry, Tamalpais Valley, Marin City, Stinson Beach, San Geronimo Valley)County of Marin, Community Development AgencyNot stated here — county pages could not be fetched at time of writingCounty CDA; confirm on the county’s siteNot fetched (HTTP 403); Mill Valley’s page directs applicants to confirm city vs unincorporated
Mill ValleyCity of Mill Valley Building DivisionNon-structural remodels require plans for review and approval; FAQ: most of what is exempt is cosmetic onlyeTRAKiT portal; counter at City Hall, 26 Corte Madera Avenue; business license required firstcityofmillvalley.gov — Permit Application Process; FAQ
San RafaelCity of San Rafael Building DivisionGeneral Permit for remodels; exempt list names painting, flooring, carpeting, counter tops and similar finish work — cabinets not namedOpenGov online permitting (from February 23, 2026); 1400 Fifth Avenuecityofsanrafael.org — Building; Permits Required and Work Exempt (PDF)
SausalitoCity of Sausalito Building DivisionNot stated on the fetched pageAll applications submitted and processed electronically; City Hall, 420 Litho Streetsausalito.gov — Building Permits
TiburonTown of Tiburon Building DivisionNot stated on the fetched pageTown Hall, 1505 Tiburon Boulevard; closed Fridaystownoftiburon.gov — staff directory
RossTown of Ross Building DepartmentLarger permit projects (new residences, additions, large landscaping) go through Advisory Design Review and Town CouncilIn person, by email, or through E-TRAKiT; 31 Sir Francis Drake Boulevardtownofrossca.gov — Building
Corte MaderaTown of Corte Madera Building DepartmentNot stated on the fetched pageApplications by email to the building permit address; revisions through Accela Citizen Access; 300 Tamalpais Drivecortemadera.gov — Submittal Requirements
San AnselmoTown of San Anselmo Building DivisionNot stated on the fetched pageeTRAKiT portal; 525 San Anselmo Avenuesananselmo.gov — Permits and Projects
LarkspurCity of Larkspur Building DivisionNot stated on the fetched pageOnline permits through eTRAKiTlarkspur.ca.gov — home page (Online Permits link)
Belvedere, Fairfax, NovatoEach city or town’s own building divisionNot stated — sites could not be fetched at time of writingConfirm with the city or townNot fetched (HTTP 403)
Marin jurisdictions compared. Each cell is drawn from the page named in the final column and listed under Sources; rows marked not fetched are jurisdictions whose sites refused automated access at time of writing, and nothing is asserted for them beyond the general city-versus-county structure.

When Does Cabinetry Alone Need No Permit in Marin?

San Rafael publishes a list; Mill Valley publishes a principle. Neither names cabinets, and this page treats that as an open question rather than a yes.

San Rafael is the only Marin jurisdiction in this cluster that publishes a full exempt-work sheet, and it reproduces the Residential Code structure closely: a permit is required for anyone who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building, or to install, alter, repair or replace any electrical, gas, mechanical or plumbing system. Its building exemptions then include, at item 7, painting, papering, flooring, carpeting, counter tops and similar finish work, and at item 13, nonfixed and movable fixtures, cases, racks, counters and partitions not over five feet nine inches in height. The word cabinets does not appear anywhere in the document. Counter tops are exempt by name; whether fixed cabinets fall under similar finish work is not something the sheet says, and we do not say it for the City.

San Rafael also prints two cautions worth carrying to every Marin address. The first is the Residential Code’s own: an exemption does not authorize work done in violation of the code. The second is San Rafael’s addition: although a building permit may not be required for listed work, there may be conditions or restrictions on such work by the Planning Division, Fire Prevention Bureau or the Public Works Department, and the applicant must review the project with those departments to determine whether it is permissible. In a county where hillside, flood zone and wildland-fire rules are routine, that second caution is not boilerplate.

Mill Valley’s FAQ takes the other approach. Asked whether almost anything one improves, repairs or replaces on a property requires a permit, the City answers that most of what is exempt is work that is of a cosmetic nature only, and separately notes that replacing a water heater requires a permit. Its permit instructions then state that non-structural remodels require plans for review and approval. Read together, Mill Valley treats a kitchen remodel — even one that keeps the walls — as a plan-review project, and leaves open whether cabinets replaced in place with nothing else touched are cosmetic. Sausalito, Tiburon, Ross, Corte Madera, San Anselmo and Larkspur publish how to apply but not what is exempt, and their rows in the table say so.

What Turns a Marin Cabinet Project Into a Permitted Remodel?

The same four things as everywhere — a wall, a pipe, a wire, the exterior — plus a fifth that is distinctly Marin: design review.

San Rafael’s permit sheet is the clearest local statement of the four triggers, because it defines permit-required work to include altering or replacing any electrical, gas, mechanical or plumbing system; its permit menu then sorts a remodel under General Permit — new structures, remodels, additions, repairs, pools, decks — rather than under Minor Permit, which it reserves for work needing minor to no plan review such as reroofs, electrical service, water heaters and furnaces. A kitchen that relocates a sink, adds a circuit for an induction range, or opens a wall to the dining room is a General Permit in San Rafael’s vocabulary and a plan-review submittal in Mill Valley’s.

The fifth trigger is the town’s design review. Ross states on its building page that certain types of projects requiring a building permit — new residences, large landscaping projects, additions and the like — are typically reviewed by the Advisory Design Review Group and approved by the Town Council. A kitchen inside existing walls is not on that list, and we do not suggest it is; but a kitchen that grows into an addition, or changes a window or door on an elevation, can be, and in Ross that means a public body rather than a plan checker. Other Marin towns have their own versions of design review for exterior change, and Discovery is where we establish whether a given kitchen touches the envelope at all.

Electrical and plumbing permits sit with the licensed trades that do that work, under the general contractor who holds the building permit. Our scope is the cabinetry: we build it in Rocklin, we install it with our own crews, and we coordinate the shop drawings against the plan set the remodel is permitted under. Where a Marin kitchen keeps every fixture and circuit where it is, the question of a permit is the question in the previous section — and where it does not, the permit is the general contractor’s to pull and the inspection sequence sets our installation date.

How Do the Marin Towns Take an Application?

Four different portals, one email inbox, and one town that commits to review times on its own page.

Mill Valley is the most fully documented. Applications go through the City’s eTRAKiT portal; contractors obtain a professional account by emailing their CSLB number and business email to the Building Division, and owner-builders set up an account and, if they will do the work or act as general contractor, upload the City’s owner/builder packet. A Mill Valley business license is required before a permit application can be made. The City’s permit-process page publishes a review-time table: express permits in one to three business days, with some minor permits issued automatically to licensed contractors; minor permits that need review, such as heat pump and gas-line work, in seven to ten business days; plan check for residential and commercial projects at a minimum of four to six weeks; revisions to existing permits at a minimum of two to three weeks. Those figures are Mill Valley’s, published on its own page, and they are the only review times on this page because Mill Valley is the only Marin jurisdiction here that publishes them. The building counter is at City Hall, 26 Corte Madera Avenue.

San Rafael launched OpenGov as its online permitting system on February 23, 2026, replacing eTRAKiT for new applications, and states that all new permit applications must be submitted through it; the Building Division is at 1400 Fifth Avenue. Sausalito states that all building permit applications are submitted and processed electronically, through a submission form linked from its Building Permits page, with City Hall at 420 Litho Street. Ross accepts building permit applications and plan-check submittals in person, by email, and through E-TRAKiT, at 31 Sir Francis Drake Boulevard, with walk-in counter hours on weekday mornings or by appointment. Corte Madera takes building permit applications by email to its building-permit address with the project address as the subject line, and revisions through Accela Citizen Access; Town Hall is at 300 Tamalpais Drive. San Anselmo uses its own eTRAKiT portal at 525 San Anselmo Avenue; Larkspur links an eTRAKiT online-permits portal from its home page; Tiburon’s Building Division is at Town Hall, 1505 Tiburon Boulevard, and Town Hall is closed on Fridays.

Belvedere, Fairfax and Novato could not be fetched at the time of writing; their rows say so. None of the fetched town pages, other than Mill Valley’s, publishes a fee figure or a review time, and none appears here as a result. What the pattern shows is that a Marin kitchen remodel is a digital submittal nearly everywhere, that the applicant of record must be set up in the town’s portal before plans can be filed, and that the licensed contractor running the remodel is the party the portals are built around.

How Does Our Process Absorb a Marin Permit?

The jurisdiction is settled in the first week. After that, Marin is a scheduling problem rather than a design one.

During Discovery we confirm which Marin office governs the address, using the town’s own map where one is published, and we record whether the parcel sits in a design-review overlay, a flood zone, or a hillside area that San Rafael’s cautions describe. Conceptual Design decides whether fixtures move; that decision decides whether the kitchen is a cosmetic project or a plan-review one, and in Mill Valley it decides whether a four-to-six-week plan check sits in the calendar. Design Development and Final Specifications produce our shop drawings against the plan set the remodel is filed under, and nothing in fabrication waits on the town: cabinetry is built in Rocklin while the permit is in review, against dimensions frozen only once the approved drawings fix where walls and rough-ins will be.

Installation is where Marin’s geography matters. Our crews travel from Rocklin, and a Tiburon or Stinson Beach address sets a delivery route and a day; a town that closes on Fridays sets inspection days. We schedule installation against the inspection sequence rather than the finish date, and on a permitted remodel the electrical and plumbing finals belong to the trades that pulled those permits. On a cabinets-only project with nothing else touched, there is no inspection to wait for, and the only Marin question left is the one this page cannot answer for you: whether your town, asked directly, treats that project as cosmetic.

Frequently Asked Questions

Is my Marin address a county permit or a town permit?
It depends on whether the parcel is inside a city or town limit, not on the mailing address. Kentfield, Greenbrae, Strawberry, Tamalpais Valley, Marin City, Stinson Beach and the San Geronimo Valley are unincorporated and belong to the County’s Community Development Agency; Mill Valley, Sausalito, Tiburon, Belvedere, Ross, Larkspur, Corte Madera, San Anselmo, Fairfax, San Rafael and Novato each issue their own. Mill Valley’s permit instructions tell applicants to confirm this before applying.
Do I need a permit to replace kitchen cabinets in Marin?
San Rafael’s exempt-work sheet names painting, papering, flooring, carpeting, counter tops and similar finish work, and movable cases and counters under five feet nine inches, but does not name cabinets. Mill Valley’s FAQ says most of what is exempt is cosmetic only and its instructions say non-structural remodels require plans. Neither page answers a cabinets-only project directly; ask the town before demolition.
What does Mill Valley say about review times?
Its permit-process page publishes a table: express permits in one to three business days, minor permits that need review in seven to ten business days, plan check for residential and commercial projects at a minimum of four to six weeks, and revisions at a minimum of two to three weeks. Mill Valley is the only Marin jurisdiction on this page that publishes review times.
Which Marin towns accept applications online?
Mill Valley, San Anselmo and Larkspur use eTRAKiT portals; Ross accepts applications in person, by email or through E-TRAKiT; San Rafael moved to OpenGov on February 23, 2026 for all new applications; Sausalito processes all applications electronically through a submission form; Corte Madera takes applications by email and revisions through Accela.
When does Ross design review apply to a kitchen?
Ross states that certain projects requiring a building permit — new residences, large landscaping projects, additions and the like — are typically reviewed by the Advisory Design Review Group and approved by the Town Council. A kitchen within existing walls is not on that list; a kitchen that becomes an addition or changes an elevation may be.
Why does this page not quote Marin County itself?
Because the County’s web pages returned an access-denied response to every fetch at the time of writing, and this guide does not cite a page it has not read. The County row in the table is marked accordingly, and the County’s own site is the place to confirm what it exempts and how it routes applications.

Explore

Marin Kitchens, Permits and the Rest of the Guide

The neighboring jurisdiction pages, the Marin service-area pages for the towns named above, and the services this page refers to.